Laterals

April 19, 2018

$7,411 per house.

April 19, 2018

$1,649,950

Right of Way work - $893,950. 

Private Property work (work not 100% completed yet) - $756,000. 

April 19, 2018

Council had to pass an ordinance specific to the project to permit a design-build method for contracting.

April 19, 2018

It is a sewer cleanout usually located adjacent to the sidewalk (between sidewalk and house) in urban areas.  In Lakewood, a Tee is used so that snaking or CCTV of the lateral line can go to either the mainline in the street or to the house.

April 19, 2018

The resident would be required to complete the work with their own contractor at 100% their own expense.

April 19, 2018

The trapped storm sewer laterals which were blocked prevented the lateral launch.

April 19, 2018

The Right of Way and private property infrastructure were installed at the same period of time.  The 2’ long vitrified clay pipe sections in the right of way and private property have equivocally the same performance.  The trapped storm laterals...

Pages